Carriage Projects
A large focus of the volunteer projects around The Bellarine Railway centre around the passenger rollingstock. We have a number of carriage projects ongoing, to ensure our fleet is ready to meet our operational needs both now and into the future.
SP5 February 2025
End Walls – 21/2/2025


CAR 19 February 2025
Passenger Saloon Works – 11/2/2025


Similar interior design colors had been applied to the ceiling panels (silver) with black trim. The scotia between the walls and ceiling were also originally silver with a small black half round beading on each side. This takes care of the Second Class saloon. The First Class had different trim colours and is yet to be tackled.


CAR 19 November 2024
End Canopy – 20/11/2024


CAR 19 September 2024
Bogie Restoration – 17/9/2024



BU1141 July 2024
Quiet Winter – 16/07/2024
As is usual for The Bellarine Railway, work on the ‘project carriages’ has slowed for winter, while some of the operational cars spend time in the workshops. This is due to The Blues Train running year-round, with a four month winter break to action any repairs. During this time, ex-Tasmanian Car AAR1 and ex-Western Australian car ZA200 will occupy the workshop space from May till October, 2024.
To that end, progress on BU1141 has been solid, with most of the South side of the car now sealed below the window sill, with the exception of one windowsill which still requires some structural repair.
A test coat of the final corporate colours was applied to one compartment of the BU, and during the shunt to get AAR1 into the workshop it provided a nice opportunity to see the near finished product in the sunlight. Pictured below.
Work on this carriage will resume in October 2024.

BU1141 February 2024
Further Progress and Roof Condition – 15/02/2024
Work has continued at a great pace on BU1141, with two compartments (on one side) well on their way to being readied for paint. We have been sanding back the peeling QR paint with a low-grit sandpaper, in an attempt to generate some level of smoothness between the existing paint and the raw timber. We have then applied a thick coat of white primer, and sanded this back with some higher grit sandpaper to achieve a smooth finish. The few remaining defects have been fixed with body filler. This has resulted in a respectable finish considering the state of the surface.
As you can see in the third picture, this carriage has had a crane spreader bar dropped on it at some point in its history. We knew this had happened during its moves around the east cost in the early 2000s, and from our inspection of the roof it seems to have survived the impact. The exterior boards will require replacement anyway, as they are warped from a life out in the elements, but thankfully the curved roof beams are, for the most part unharmed.
Work for the next month will once again be focused on cleaning up the south-side of the carriage, working our way from left to right. There is one window needing a new sill beam, and a few needing new trim, but otherwise the rest of this side of the carriage looks to be nice and straightforward.


BU1141 January 2024
The Project Begins! – 04/01/24
You join us at the very beginning of an exciting restoration effort to return BU1141 to service. The 15th of December 2023 saw the carriage shunted into the workshop space at Lakers Siding, for some preliminary investigations take place. The carriage appeared to be in remarkably good condition on the south side, with some significant (but not insurmountable) challenges on the north side. The bogies appear to be in okay condition, and there is plenty of meat left on the tires. In contrast to our other Evans Cars, 1141 does not have a wooden bolster and leaf springs, but rather a two-part steel bolster, with coil springs in between. This was an exciting finding as the cost to replace a cracked wooden bolster can be quite a lot.
Additionally, the roof has had no tarp for several years, and it looks as though age has caught up to the timber boards, with a lot of them warped and rotten around the edges. This isn’t a massive challenge to renew, but will require a fair amount of new timber and some time working at height to repair it. As for the previously mentioned challenges on the north side, we have three vertical doorframes that are rotten through near the base, which will require replacement of portions of the beams. There are a few cosmetic timbers on the exterior to replace, and the interior is in fine condition for a repaint and patch-up, complete with its pressed steel roof!
The air brake system underneath the carriage is all intact, but we will be modifying this to allow for running on both vacuum and air braking. We will be copying the design of our existing dual braked carriages, whereby the vacuum cylinder and actuating arm is directly linked to the bogie (much like any vacuum braked vehicle), and the air system is positioned further ‘upstream’, and is linked to the vacuum actuating arm, driving the same system/linkage. This is where a lot of time will be spent in the future, as we have to essentially install the entire vacuum system to the carriage from scratch.
The scope of works for the next while will be to progress through the south side of the carriage, fixing any rotten windowsills and door handles that we can find, and then painting a coat of primer over these areas. We have already got the first compartment to a paint-prep stage, with all the structural timberwork now fit-for-service. This involved making a new window sill, and cutting a patch out of the upright beam.

CAR 19 December 2023
End Platforms – 10/12/2023


CAR 19 November 2022
Timber – 5/11/2022


CAR 19 August 2022
Steady Progress – 1/8/2022
Steady progress, with all of the rotten bottom side and end frame timbers now replaced. Rotten bottom of all pillars spliced and strengthened. As a result, all horizontal frame members are now as straight and parallel as possible and structurally sound. Sides now straight and roof almost lost all of its sagging sections. End iron panels at one end back in place. Onward and upward from here on!

CAR 19 December 2021
Welcome to the Car 19 Project – 28/12/2021
The Geelong Community Foundation kindly provided a grant of $9,000 to assist purchase materials so that the volunteers would be able to proceed with the restoration of ex-South Australian Carriage 19 and gain great friendship and satisfaction for working on the project.

Further evidence of its identity was uncovered on the door, with ’19’ neatly sign written on it. When Car 19 was withdrawn from passenger use in 1928 and converted to a combined sleeping and tool van for the pump and windmill maintainers, it was numbered 4904, but at a date not known to us, was changed to 5077, the number that was visible on it when obtained from Terowie in 1980.